一、液壓萬能試驗(yàn)機(jī)主機(jī)保養(yǎng):
Maintenance of main engine of hydraulic universal testing machine:
1、機(jī)器所配的夾具應(yīng)涂上防銹油保管;1. The fixture equipped with the machine should be coated with rust-proof oil for storage.
2、由于液壓萬能試驗(yàn)機(jī)的鉗口經(jīng)常使用,容易磨損,氧化皮太多時(shí),容易導(dǎo)致小活塞損傷漏油,所以鉗口處應(yīng)經(jīng)常打掃,保持清潔(最好每次做完試驗(yàn)后進(jìn)行清掃);2. Because the clamp of hydraulic universal testing machine is often used, easy to wear and tear, and when the oxide scale is too much, it is easy to cause damage and oil leakage of small piston, so the clamp should be cleaned regularly and kept clean (preferably after each test);3、鑲鋼板與襯板接觸的滑動(dòng)面、襯板上的燕尾槽面應(yīng)保持清潔,定期涂一層薄的MoS2(二硫化鉬)潤滑脂;3. The sliding surface and dovetail groove surface of the lining plate should be kept clean, and a thin MoS2 (molybdenum disulfide) grease should be coated regularly.
4、定期檢查鉗口部位的螺釘,如發(fā)現(xiàn)松動(dòng),及時(shí)擰緊;4. Check the screw at the nipple regularly, if it is loose, tighten it in time.
5、定期檢查鏈輪的傳動(dòng)情況,如發(fā)現(xiàn)有松動(dòng),請(qǐng)將張緊輪重新張緊;5. Check the transmission of sprocket regularly. If loosening is found, please re-tighten the tensioning wheel.
二、控制系統(tǒng)保養(yǎng):
2. Maintenance of control system:
1、定期檢查控制器后面板的連接線是否接觸良好,如有松動(dòng),應(yīng)及時(shí)緊固;1. Check regularly whether the connection wire of the back panel of the controller is in good contact. If it is loose, it should be tightened in time.
2、試驗(yàn)后若有一段較長的時(shí)間不用機(jī)器時(shí),關(guān)閉控制器和電腦;2. Turn off the controller and the computer if there is a long period of time after the test when the machine is not used.
3、控制器上的接口為一一對(duì)應(yīng),插錯(cuò)接口可能對(duì)設(shè)備造成損壞;3. The interface on the controller is one-to-one correspondence, and the wrong interface may cause damage to the equipment.
4、插拔控制器上的接口必須關(guān)閉控制器電源。
4. The interface on the plug-in controller must turn off the power supply of the controller.
三、油源的保養(yǎng):
III. maintenance of oil source:
1、定期檢查主機(jī)和油源處是否有漏油的地方,如發(fā)現(xiàn)有漏油,應(yīng)及時(shí)更換密封圈或組合墊;1. Check regularly whether there is oil leakage in the main engine and oil source. If oil leakage is found, the sealing ring or combination gasket should be replaced in time.
2、根據(jù)機(jī)器的使用情況及油的使用期限,定期更換吸油過濾器和濾芯,更換液壓油。
2. According to the use of the machine and the service life of the oil, the oil-absorbing filter and filter element are replaced regularly, and the hydraulic oil is replaced.
3、長時(shí)間不做試驗(yàn)時(shí),注意關(guān)斷主機(jī)電源。如果機(jī)器在待機(jī)狀態(tài),轉(zhuǎn)換開關(guān)應(yīng)打到加載檔,因?yàn)槿绻D(zhuǎn)換開關(guān)。
3. When the test is not done for a long time, turn off the power supply of the main engine. If the machine is in standby state, the switch should be put in the loading file, because if the switch is in standby state.http://www.beeaycbp.cn